NOTICE: This forum is for users to exchange information about TDS Technology distributed range of products. While it is moderated by TDS Technology, each post may not be explicitly answered by TDS Technology employees. If your case needs an immediate direct response, please dial (65) 6366 1661.

Welcome to TDS FORUM

Dear Visitor,

Having built a sterling reputation as one of the Top Valued-Added Solution Provider, TDS Technology (S) Pte Ltd aim to provide our Valued Customer with continuous engineering support and after-sales services. This is why this TDS Forum site is created.

Through this site, our Valued Customer can get to post their questions at anytime and from any part of the world! Our dedicated and competent team of System Application Engineers, equipped with their extensive field experience in manufacturing, automation industry and on-site know-how will be here to provide you with the optimized solution!

You will also get to interact with other TDS forum members' of the similar industry and share your comments, experiences or even your company success stories after using our product!
We hope you will enjoy this site.

Yours sincerely,
TDS Forum Administrator

Beckhoff Stadium Control System - Allianz Arena© FIFA World Cup 2006

When millions of fans from all over the world watch the opening match of the FIFA World Cup on June 9, 2006 in Germany, Allianz Arena in Munich will be the center of the action. In addition to a wide range of architectural and technological highlights, the planners also set new standards in facade illumination during the construction of the new football stadium. The company responsible for the technical building services, VA TECH ELIN EBG, used Beckhoff Bus Terminals as the I/O system and Beckhoff CX1000 controllers for the lighting system.

Hakko Monitouch V-SFT Ver. Launch on 23 March 2007

Enhanced Hydraulics for Extrusion Blow Moulding

Compact IPC - C6920 / C6925



CX9000

Basic CPU module CX9000

Syndicate content